
Construction Site Induction Software
Automate site-specific inductions, check that workers understood them, and hold the evidence CDM 2015 expects. Every worker resolves to one of two states on every site: Cleared or Not Cleared.
Under the Construction (Design and Management) Regulations 2015, the principal contractor must ensure a suitable site induction is provided before anyone starts work. Most contractors run inductions. Far fewer can produce, on demand, a dated record showing who was inducted, when, by whom, and whether they understood what they were told.
That gap is a software problem, not a training problem. Paper sheets, spreadsheets and inboxes record attendance well enough. They do not prove readiness, and they do not tell a site manager, at eight o'clock on a Monday, which of the forty people at the gate are actually cleared to work.
LUMA1 delivers the standard part of the induction digitally, before mobilisation, checks understanding as the worker goes, and holds the result as a dated attestation against that worker on that site. Read the background in our guide on what a construction site induction must cover.
What the Software Does
Induction, understanding and credentials held in one place, per worker, per site, so site management decisions are made on evidence rather than assumption.
Site-Specific Content, Not a Generic Script
Each project gets its own induction: layout, access routes, traffic management, exclusion zones, permits, welfare and emergency arrangements. CDM 2015 expects the content to reflect the actual risks of the actual site, so the software builds inductions per site rather than issuing one company-wide deck.
Delivered Before Mobilisation
Workers and subcontractors complete the standard part of the induction on their own phone, before they travel to site. The supervisor's brief on arrival is then left to do the one job it is actually needed for: what is specific to that day, on that face of the job.
Understanding Checked, Not Assumed
A signature on a sheet records attendance. The system checks understanding as the worker goes and records the result, so the evidence shows who understood what they were told, not just who was in the room.
Credentials Verified Alongside the Induction
CSCS and NPORS card checks sit next to the induction record, so competence and briefing are held against the same worker on the same site, and an expired card is visible before the gate, not after.
Cleared or Not Cleared
Every worker resolves to one of two states on every site. Cleared means induction complete, understanding checked, credentials in date. Not Cleared means something is missing, and the system says exactly what. There is no third, ambiguous status.
Evidence on Demand
Dated, checked attestations per worker, per site, exportable when a client, an auditor or an HSE inspector asks. Producing the record takes minutes, not a search through folders, signing sheets and inboxes.
Proving CDM 2015 Compliance
The duty is specific, and so is the evidence needed to discharge it. The software is built around what a principal contractor is actually asked to show.
The principal contractor must ensure a suitable site induction is provided. Every induction issued through the system is tied to a named site and a named worker, with the date it was completed.
Contractors carry a parallel duty for workers under their control. Subcontractor labour is inducted and tracked in the same record, so the principal contractor sees the whole workforce, not just direct employees.
HSE inspectors and clients ask for induction records while the project is live. Records are exportable per site and per worker, for the duration of the project and after it completes.
Questions
What is construction site induction software?
Construction site induction software delivers, checks and records site-specific inductions digitally instead of on paper. It issues the induction for a particular site, confirms the worker understood the content, and holds a dated record against that worker so the principal contractor can prove the induction happened.
Does digital induction software satisfy CDM 2015?
CDM 2015 requires the induction to be suitable and site specific, but it does not mandate a format. Standard content can be delivered digitally before mobilisation, provided it is specific to that site and understanding is checked and recorded. Most contractors pair it with a short in-person brief on arrival covering what is specific to that day.
Who is responsible for site inductions on a UK project?
Under CDM 2015, Regulation 13(4)(a) places the duty on the principal contractor to ensure a suitable site induction is provided. Regulation 15(9)(a) places a parallel duty on individual contractors for workers under their control where the principal contractor has not already done so.
Does it cover subcontractors and agency workers?
Yes. The duty covers everyone working on site, not just directly employed staff. Subcontractors, agency workers and visitors with site access are inducted and tracked in the same system, so the record is complete regardless of who employs the worker.
How long does it take to set up on a project?
A site is configured with its own induction content, hazards and rules, and workers are invited by link. Because the standard content is reused across projects and only the site-specific layer changes, adding a new site is a configuration step rather than a rebuild.
Cleared or Not Cleared. Nothing In Between.
Induction delivered before the gate, understanding checked as the worker goes, credentials verified alongside it, and a dated attestation held against every worker on every site. When someone asks for evidence, the answer takes minutes.